Please ensure Javascript is enabled for purposes of website accessibility
    • About Us
    • Team
    • Housing
    • Shelters
    • Historic
    • Institutional + Spiritual
    • Commercial + Public
    • On the Boards
  • Impact
  • Careers
  • Contact
  • Blog
Menu

CARLETON HART ARCHITECTURE

  • Carleton Hart
    • About Us
    • Team
  • Portfolio
    • Housing
    • Shelters
    • Historic
    • Institutional + Spiritual
    • Commercial + Public
    • On the Boards
  • Impact
  • Careers
  • Contact
  • Blog
 

BLOG

 
Categories
  • Events
  • Groundbreakings
  • Openings
  • Recognitions
  • Site Visits
 
 
201463 Woody Guthrie SW Corner_sm.jpg

Woody Guthrie Opening!

June 17, 2019

Woody Guthrie Place is celebrating its opening at the end of this week, and new residents will start moving in early July. A Rose Community Development project, Woody Guthrie Place is a milestone project for CHA. The project stands out in terms of design, urban renewal, and community building. But, one piece of its story of which we are particularly proud is the sustainability measures that were achieved.

Woody Guthrie Place is pursuing US Green Building Council’s (USGBC) LEED for Homes Mid-rise certification program, targeting the Gold level standard.  The building is built with an energy efficient envelope design, heat recovery ventilation system, and includes the following LEED strategies:

  • Moderately walkable community with amenities located a short walk from public transportation.

  • Bike routes, and other community resources.

  • Enhanced insulation installation practices.

  • Double-pane, high efficiency, insulated vinyl windows.

  • On-site infiltrated stormwater treatment, avoiding impact to the local municipal storm water system.

  • Highly-efficient heat recovery ventilation mechanical system and lighting systems to reduce consumption and increase energy efficiency of the building.

  • Photovoltaic solar panels to offset house electrical loads.

  • Tight building envelope construction (i.e., special attention was taken to seal air leaks).

  • Third-party performance testing of building systems to improve energy performance, reduce draftiness and ensure enhanced indoor air-quality.

The project received a PGE Renewable Grant Solar Award, which covered the costs to install PV panels over 70% of the roof.  Woody Guthrie has a 402-solar panel system which will produce 149,300 kWh annually, providing a 42.5% in energy cost savings in additional to the other energy savings measures (via Energy Trust of Oregon Incentives). We estimate that the energy generated will offset all house electrical loads and still have excess energy to net meter back to the utility.  

In Openings
← Expanding the Capacity of the HeartMichelle Black Promoted to Principal! →

Latest Posts

Featured
Oct 14, 2022
Mamook Tokatee: "To Make Beautiful"
Oct 14, 2022
Oct 14, 2022
Dec 7, 2021
Scholarship Honors William Hart Legacy
Dec 7, 2021
Dec 7, 2021
Nov 22, 2021
CHA Give Guide!
Nov 22, 2021
Nov 22, 2021
Oct 5, 2021
Jennifer Hoffman, AIA Joins CHA Leadership
Oct 5, 2021
Oct 5, 2021
Sep 14, 2021
The Madeleine Wins Historic Preservation Award
Sep 14, 2021
Sep 14, 2021
May 3, 2021
A Closer Look at Flame Retardants and Stain Repellants 
May 3, 2021
May 3, 2021
Mar 31, 2021
Farewell to Bill – by Brian Carleton
Mar 31, 2021
Mar 31, 2021
Nov 10, 2020
Honoring Veterans Day
Nov 10, 2020
Nov 10, 2020
Sep 21, 2020
A Look Into Embodied Carbon
Sep 21, 2020
Sep 21, 2020
Aug 12, 2020
Carleton Hart Becomes a B Corp™
Aug 12, 2020
Aug 12, 2020

© CARLETON HART ARCHITECTURE PC

630 SW 5th Ave Suite #400, Portland, OR 97204 | 503.243.2252 | Accessibility Statement